Projects
Our Projects
Visit Our Latest Solar And Renewable Energy Projects

• Supply and Installation of a solar/diesel integrated power system of 13.2kw solar panels, 24 pieces of 12v 170AH high temperature Mombat batteries, Remote monitoring system, Automatic transfer switch and automatic generator starter to power three Cyberspace’s telecom tower base station at Oba Akran Ikeja, Trinity Apapa and Ikorodu. Saving 70% of diesel costs averaging five hundred thousand Naira (N500, 000) monthly.

• Supply and Installation of a solar/diesel integrated power system of 12.36kw solar panels, 24 pieces of 2v 1500AH Narada batteries, Remote monitoring system, Automatic transfer switch and automatic generator starter to power SWAP telecom tower base station at Mowe, Ogun state.

• Installation of 15 x 300W solar panels, 3.5KVA Inverter, Victron MPPT, 12 x 12v200AH Gel batteries, remote monitoring system, on 12 off sites and in branch to power critical loads and security lightings at 12 Polaris Bank Locations in 8 States in Nigeria.

Free Quote
Get A Free Quote
Tempor erat elitr rebum at clita. Diam dolor diam ipsum sit. Aliqu diam amet diam et eos. Clita erat ipsum et lorem et sit, sed stet lorem sit clita duo justo erat amet
Testimonial
What Our Clients Say!

Clita clita tempor justo dolor ipsum amet kasd amet duo justo duo duo labore sed sed. Magna ut diam sit et amet stet eos sed clita erat magna elitr erat sit sit erat at rebum justo sea clita.
Client Name
Profession

Clita clita tempor justo dolor ipsum amet kasd amet duo justo duo duo labore sed sed. Magna ut diam sit et amet stet eos sed clita erat magna elitr erat sit sit erat at rebum justo sea clita.
Client Name
Profession

Clita clita tempor justo dolor ipsum amet kasd amet duo justo duo duo labore sed sed. Magna ut diam sit et amet stet eos sed clita erat magna elitr erat sit sit erat at rebum justo sea clita.
Client Name
Profession